This a automotive repair shop that required floor replacement. Instead of replacing the floor the floor was repaired first using M1000 dry pack to fill in holes and low levels. |
In this photo the workers are pouring out a floor mixture of Steel Grip Supercoat. |
A floor squeege is then use to spread this durable coating that's as tough as steel. Using a squeege enables the user to get into cracks and creaveses easily saving time and money. |
The job is completed providing a beautiful finish. Work time 12 hours. |