This is a rooftop parking area. The principals apply to flat roofing. Steel Grip M1000 dry-pack is first used to maintain proper elevations for drainage. |
Once you have the drainage moulds completed with the dry-pack the M1000 concrete mix is placed and screeded as seen here. |
After the concrete has dried, a fiberous matte is applied with a coating of terpolymer rubber on top of the matting. |
This is also made to be a non-skid surface by applying sand or some other recycled material. |
This parkcade was then given a coating of Steel Grips Supercoat and the parking lanes were marked out. This parking area is now unsusceptible to gasoline and oil leaks. Work Time 4 Days. |